Get a quote

Case Studies

Get in Touch

Apex Sports Flooring specialises in sports floor installation, refurbishment, maintenance and line marking for schools, universities, leisure centres, gyms and professional sporting facilities throughout the UK.

Our sports flooring projects incorporate sprung timber systems, polyurethane surfaces, sports vinyl and specialist rubber flooring tailored to individual facility requirements.

Sprung Timber Sports Hall Flooring Installation in Manchester

Project: New multipurpose sports hall flooring installation

Customer: Matthew Ainsworth

Company: Brookvale Sports and Leisure Centre

Location: Manchester, Greater Manchester

Surface Area: 1,056m²

Project Value: £118,500

Installation Duration: 15 working days

Services: Wooden sports flooring, sprung flooring installation and sports hall line marking

The Customer's Requirements

Brookvale Sports and Leisure Centre required a new sprung timber floor within its main indoor sports hall.

The existing synthetic surface showed considerable signs of deterioration, including surface cracking, uneven wear and damaged line markings.

The leisure centre accommodated competitive basketball, badminton, netball, volleyball and recreational sporting activities throughout the week.

The customer required a durable sports flooring system that provided suitable shock absorption, ball rebound and surface friction for multiple sports.

Existing Sports Floor Assessment

Apex Sports Flooring assessed the existing floor and underlying structural substrate before developing the installation specification.

The assessment included:

  • Subfloor moisture testing

  • Surface level measurements

  • Inspection of existing expansion joints

  • Assessment of substrate condition

  • Finished floor height calculations

  • Sports equipment and socket positioning

  • Doorway and threshold measurements

  • Sports court layout planning

The assessment established the preparation requirements and appropriate sprung flooring construction for the facility.

Existing Flooring Removal and Subfloor Preparation

The installation team removed 1,056m² of deteriorated synthetic flooring and prepared the underlying concrete substrate.

Residual adhesives and surface contaminants were mechanically removed. Localised imperfections were repaired to provide a suitable base for the new flooring system.

Moisture readings and surface levels were checked against the selected manufacturer's installation requirements.

Sprung Timber Flooring Specification

The new sports flooring system incorporated:

  • 1,056m² of hardwood maple sports flooring

  • Resilient supporting battens and pads

  • Load-distributing subfloor components

  • Suitable moisture protection

  • Interlocking hardwood flooring boards

  • Perimeter expansion allowances

  • Sports-grade protective sealant

  • Ventilated perimeter skirting

  • Recessed sports equipment sockets

  • Compatible doorway transition profiles

The sprung construction provided controlled flexibility beneath the timber surface, supporting impact absorption during sporting activities.

Sports Hall Line Marking

Apex Sports Flooring developed a coordinated line marking layout incorporating:

  • One full-size basketball court

  • One netball court

  • Four badminton courts

  • One volleyball court

  • One recreational five-a-side football court

Contrasting line colours distinguished individual sports and reduced visual confusion where court boundaries overlapped.

The installation team measured and applied the markings according to the agreed court layouts and available safety run-off areas.

Floor Finishing and Protection

The timber flooring received a compatible sports-grade protective finish designed to withstand regular sporting use and routine cleaning.

The finishing system enhanced the natural appearance of the maple flooring while providing suitable surface characteristics for indoor sports.

The team checked perimeter expansion details, floor junctions and equipment socket finishes before handover.

The Outcome

Brookvale Sports and Leisure Centre received a complete sprung timber sports flooring system suitable for competitive and recreational activities.

The completed installation delivered:

  • 1,056m² of sprung hardwood flooring

  • Improved impact absorption

  • Eight individual sports court layouts

  • A consistent protective surface finish

  • Replacement perimeter skirting

  • Integrated sports equipment sockets

  • A coordinated maintenance programme

The installation was completed within fifteen working days and the agreed £118,500 budget.

Project Takeaway: Sprung timber sports flooring supports multipurpose sporting facilities because its resilient construction combines impact absorption with consistent playing characteristics.

Polyurethane Sports Flooring Installation at a Secondary School in Birmingham

Project: Replacement of deteriorated synthetic sports hall flooring

Customer: Rebecca Henshaw

Company: Oakbridge Secondary Academy

Location: Birmingham, West Midlands

Surface Area: 690m²

Project Value: £48,750

Installation Duration: 10 working days

Services: Polyurethane sports flooring, sports hall resurfacing and court line marking

The Customer's Requirements

Oakbridge Secondary Academy required a replacement sports floor within its main physical education hall.

The existing flooring had developed areas of surface degradation, discolouration and worn protective coatings following years of intensive use.

The hall accommodated approximately 1,200 pupils and supported physical education lessons, indoor football, basketball, badminton, netball and extracurricular sporting activities.

The school required a seamless sports flooring system that could withstand frequent use while remaining straightforward to clean and maintain.

Existing Surface Inspection

Apex Sports Flooring inspected the existing sports hall floor to determine whether the underlying substrate could support a replacement polyurethane flooring system.

The inspection identified:

  • Localised surface cracking

  • Areas of deteriorated flooring

  • Worn protective surface coatings

  • Faded sports court markings

  • Minor substrate imperfections

  • Damaged perimeter finishes

The findings informed the removal and preparation requirements for the replacement surface.

Sports Hall Subfloor Preparation

The installation team removed the deteriorated flooring and mechanically prepared the existing substrate.

Localised defects were repaired, and the surface was cleaned to remove dust, adhesive residue and loose material.

Subfloor moisture and surface regularity were checked before the new flooring installation commenced.

Polyurethane Sports Flooring Specification

The replacement flooring system incorporated:

  • 690m² of seamless polyurethane sports flooring

  • Approximately 7mm resilient rubber underlay

  • Compatible bonding adhesive

  • Pore-sealing compound

  • Approximately 2mm polyurethane wearing layer

  • Sports-grade protective topcoat

  • New perimeter finishing details

  • Compatible sports line marking paint

The selected approximately 9mm system combined a resilient base layer with a seamless polyurethane surface.

The school selected a blue sports flooring finish with contrasting court markings.

Polyurethane Flooring Installation

The installation team bonded the resilient rubber underlay to the prepared substrate.

A compatible pore-sealing compound closed the underlay's surface pores before the polyurethane wearing layer was applied.

The polyurethane system created a continuous playing surface without exposed sheet joints.

Each layer cured according to the manufacturer's specified environmental conditions and installation times before subsequent coatings were applied.

Multipurpose Sports Court Line Marking

The completed polyurethane flooring received markings for:

  • One basketball court

  • One netball court

  • Four badminton courts

  • One volleyball court

The team coordinated the line colours and court positions around the school's physical education requirements.

Court dimensions were checked against the agreed layout before the specialist line marking paint was applied.

School Holiday Installation Programme

Apex Sports Flooring scheduled the installation during the summer holidays to avoid disruption to physical education lessons.

The installation programme incorporated suitable curing periods for the polyurethane layers and sports line marking paint.

Final checks were completed before the sports hall reopened for the new academic year.

The Outcome

Oakbridge Secondary Academy received a seamless polyurethane sports flooring system suitable for daily educational and recreational use.

The completed project delivered:

  • 690m² of replacement sports flooring

  • A resilient polyurethane flooring construction

  • Seven individual sports court layouts

  • A consistent blue playing surface

  • Improved surface appearance

  • Simplified routine cleaning

  • New perimeter finishing details

The project was completed within ten working days and the agreed £48,750 budget.

Project Takeaway: Polyurethane sports flooring suits heavily used educational facilities because its seamless construction combines resilient performance with straightforward routine maintenance.

Timber Sports Floor Refurbishment at a University in Leeds

Project: Sanding, repairs, resealing and sports court remarking

Customer: Daniel Atkinson

Company: Aire Valley University Sports Facilities

Location: Leeds, West Yorkshire

Surface Area: 1,420m²

Project Value: £39,800

Installation Duration: 12 working days

Services: Sports floor refurbishment, timber floor sanding, sports hall maintenance and line marking

The Customer's Requirements

Aire Valley University Sports Facilities required extensive refurbishment of its existing hardwood sports flooring across two indoor sports halls.

The floors had been in regular use for approximately fifteen years and showed widespread surface wear, faded court markings and localised timber damage.

The university wanted to retain its existing sprung timber flooring rather than undertake a complete replacement.

Apex Sports Flooring assessed whether refurbishment could restore the playing surfaces while preserving the underlying sprung flooring construction.

Timber Sports Flooring Condition Survey

The condition survey identified:

  • Worn protective lacquer across high-traffic areas

  • Surface scratches and scuff marks

  • Damaged individual timber boards

  • Faded basketball and badminton court markings

  • Localised surface staining

  • Minor gaps between selected flooring boards

  • Deteriorated perimeter finishing details

The underlying sprung floor system remained suitable for retention, subject to localised repairs and refurbishment.

Localised Timber Floor Repairs

Before sanding commenced, the installation team repaired damaged sections of flooring.

The repair programme included:

  • Replacement of approximately 28m² of damaged timber flooring

  • Securing selected loose flooring boards

  • Repairing compatible perimeter components

  • Inspecting sports equipment sockets

  • Addressing localised surface imperfections

Replacement timber was selected to match the existing flooring construction and dimensions.

Retaining the majority of the existing floor reduced the material requirements associated with a complete replacement.

Sports Hall Floor Sanding

Apex Sports Flooring mechanically sanded 1,420m² of existing hardwood sports flooring using specialist equipment with dust extraction.

Progressive sanding grades removed deteriorated coatings, previous line markings and superficial surface damage.

The sanding process created a consistent timber surface suitable for the application of a new protective finishing system.

Perimeter areas and locations surrounding sports equipment sockets received additional attention to achieve a uniform finish.

Sports Floor Sealing and Lacquering

The refurbished timber surfaces received a compatible sports flooring finishing system incorporating:

  • One compatible primer coat

  • Sports-grade protective lacquer

  • Specialist court marking paint

  • Final protective finishing coats

The finishing products were selected as a compatible system to support adhesion, durability and suitable playing surface characteristics.

The application programme incorporated the manufacturer's specified drying and curing periods.

Sports Court Line Marking Refurbishment

The two sports halls received a combined total of:

  • Two basketball courts

  • Two netball courts

  • Eight badminton courts

  • Two volleyball courts

  • Two recreational five-a-side football courts

The new markings replaced faded and inconsistent court boundaries.

Contrasting line colours distinguished individual sports within each multipurpose playing area.

Phased Refurbishment Programme

The university required continued access to at least one sports hall during the refurbishment programme.

Apex Sports Flooring completed the works in two phases, allowing activities to transfer between facilities as each hall became available.

The phased approach reduced disruption to student sports clubs, training sessions and recreational bookings.

The Outcome

The university retained its existing sprung timber flooring while restoring both sports halls to a consistent playing condition.

The completed refurbishment delivered:

  • 1,420m² of sanded and resealed timber flooring

  • Approximately 28m² of replacement timber boards

  • Sixteen individual sports court layouts

  • New protective surface coatings

  • Improved floor appearance

  • Restored court marking visibility

  • Retention of the existing sprung floor construction

The refurbishment was completed within twelve working days and the agreed £39,800 budget.

Project Takeaway: Timber sports floor refurbishment extends the usable life of existing flooring because sanding, localised repairs and resealing restore the playing surface without requiring complete structural replacement.

Vinyl Sports Flooring Installation Across Four Schools in London

Project: Multi-site sports hall and multipurpose activity flooring installation

Customer: Louise Barrington

Company: Capital Education Estates Partnership

Location: Greater London

Number of Schools: 4

Combined Surface Area: 1,840m²

Project Value: £112,600

Installation Duration: 20 working days

Services: Vinyl sports flooring, sports hall flooring installation and sports court line marking

The Customer's Requirements

Capital Education Estates Partnership required replacement sports flooring across four educational establishments.

The existing surfaces varied between locations and included ageing vinyl flooring, deteriorated synthetic surfaces and worn multipurpose hall floors.

The education partnership wanted a consistent sports flooring specification that accommodated physical education lessons, assemblies, examinations and extracurricular activities.

Durability, cleaning requirements and installation times were important considerations because the halls experienced frequent changes in use.

Individual School Flooring Assessments

Apex Sports Flooring assessed each location to establish the substrate condition and appropriate installation requirements.

The combined flooring areas included:

  • Secondary academy sports hall: 800m²

  • Primary school sports hall: 420m²

  • Junior school activity hall: 360m²

  • Specialist education activity hall: 260m²

The assessments considered substrate moisture, surface regularity, doorway heights, existing sports equipment and proposed court layouts.

Sports Vinyl Flooring Specification

The education partnership selected a cushioned sports vinyl system suitable for its intended educational and recreational activities.

The combined installation specification incorporated:

  • 1,840m² of cushioned sports vinyl flooring

  • Approximately 6.5mm overall flooring thickness

  • Reinforced dimensional stability layers

  • Resilient foam backing

  • Protective polyurethane surface treatment

  • Compatible flooring adhesive

  • Heat-welded sheet joints

  • Replacement perimeter finishes

  • Specialist sports court marking paint

A consistent flooring specification simplified cleaning and maintenance requirements across all four schools.

Existing Floor Removal and Preparation

The installation team removed deteriorated flooring materials and mechanically prepared the exposed substrates.

Localised defects were repaired before compatible smoothing compounds were applied where necessary.

Moisture testing and surface level checks established whether each substrate met the flooring manufacturer's installation requirements.

Vinyl Sports Flooring Installation

The sports vinyl was positioned and bonded using the manufacturer's specified installation method.

Individual flooring sheets were cut accurately around perimeter walls, sports equipment sockets and doorway openings.

The completed sheet joints were heat welded to create secure connections and reduce opportunities for dirt and moisture to penetrate beneath the flooring.

Individual Sports Hall Line Marking Layouts

Court markings were tailored to the requirements and available dimensions of each school.

Secondary Academy

  • One basketball court

  • One netball court

  • Four badminton courts

  • One volleyball court

Primary School

  • Two badminton courts

  • One junior basketball court

  • Multipurpose physical education activity markings

Junior School

  • Two badminton courts

  • One junior basketball court

  • Physical education activity zones

Specialist Education School

  • Adapted sporting activity markings

  • Movement and coordination zones

  • Contrasting activity boundaries

The marking layouts reflected the intended activities and available sporting space at each location.

Coordinated School Holiday Installation

Apex Sports Flooring scheduled all four installations during the summer holidays.

The team coordinated material deliveries, flooring removal, preparation, installation and line marking across each site.

School representatives received maintenance guidance and information regarding suitable furniture protection for assemblies and examinations.

The Outcome

Capital Education Estates Partnership received four replacement sports floors incorporating a consistent vinyl flooring specification.

The completed project delivered:

  • 1,840m² of cushioned sports vinyl flooring

  • Four refurbished indoor sporting facilities

  • Heat-welded flooring joints

  • Individual sports and activity marking layouts

  • Consistent flooring maintenance requirements

  • Replacement perimeter finishes

  • Improved multipurpose hall functionality

The installation programme was completed within twenty working days and the agreed £112,600 budget.

Project Takeaway: Cushioned vinyl sports flooring accommodates multipurpose educational facilities because its resilient construction supports physical activities while providing a practical surface for everyday school use.

Rubber Sports Flooring Installation at a Commercial Gym in Bristol

Project: Specialist rubber flooring installation across strength and conditioning zones

Customer: Stephen Merritt

Company: Westpoint Performance and Fitness Centre

Location: Bristol

Surface Area: 960m²

Project Value: £74,250

Installation Duration: 9 working days

Services: Rubber sports flooring, gym flooring installation and specialist fitness zone surfacing

The Customer's Requirements

Westpoint Performance and Fitness Centre required specialist flooring for a newly developed commercial gym and strength training facility.

The gym incorporated free weights, Olympic weightlifting platforms, cardiovascular equipment, resistance machines and functional training areas.

The customer required different rubber flooring thicknesses according to equipment loads, anticipated impact levels and individual training activities.

Reducing impact transmission, protecting the underlying substrate and providing durable training surfaces were key project requirements.

Fitness Facility Flooring Assessment

Apex Sports Flooring reviewed the proposed gym equipment layout and individual training zones.

The assessment considered:

  • Free weight drop areas

  • Olympic lifting platform positions

  • Heavy resistance equipment

  • Cardiovascular machine locations

  • Functional training activities

  • Subfloor construction

  • Equipment loading requirements

  • Impact and vibration transmission

  • Flooring transitions

  • Cleaning and maintenance arrangements

The assessment informed a zoned rubber flooring specification rather than a single flooring thickness throughout the facility.

Rubber Gym Flooring Specification

The 960m² fitness facility received four individual rubber flooring specifications.

Heavy Free Weights Area

  • Surface area: 300m²

  • Flooring thickness: 30mm

  • Flooring type: High-density rubber gym tiles

Olympic Weightlifting Area

  • Surface area: 180m²

  • Flooring thickness: 40mm

  • Flooring type: Heavy-duty impact-resistant rubber tiles

Functional Training Area

  • Surface area: 260m²

  • Flooring thickness: 15mm

  • Flooring type: Resilient rubber fitness flooring

Cardiovascular and Resistance Equipment Area

  • Surface area: 220m²

  • Flooring thickness: 10mm

  • Flooring type: Commercial-grade rubber roll flooring

The different thicknesses reflected the anticipated equipment loads and impact requirements within each training zone.

Subfloor Preparation

The existing concrete substrate was inspected for moisture, surface irregularities and contamination.

Localised defects were repaired, and the surface was mechanically prepared where required.

The team established finished floor levels across the different training zones to accommodate flooring thickness changes and suitable transition arrangements.

Rubber Flooring Installation

Apex Sports Flooring installed the rubber tiles and roll flooring according to the selected systems' specifications.

The installation incorporated:

  • Accurate tile positioning

  • Secure flooring connections

  • Compatible adhesives where required

  • Precision perimeter cutting

  • Equipment base finishing

  • Suitable transition profiles

  • Localised floor protection around heavy equipment

The rubber flooring provided dedicated training surfaces suited to each area's anticipated use.

Functional Training Zone Markings

The functional training area received specialist markings incorporating:

  • Four 15m training lanes

  • Distance interval markings

  • Agility training zones

  • Individual exercise station boundaries

  • Functional fitness activity areas

The markings helped distinguish different training activities and provided clear boundaries for group exercise sessions.

Flooring Transitions

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Contact

Apex Sports Flooring
Trading style of Courtship Limited
Unit D
The Old Brickyard
Higher Poole
Wellington
TA21 9GN

Apex Sports Flooring is a trading style of Courtship Limited, registered in England & Wales (company no. 02160429).